Wallumbilla Vent Lines
This project required detailed planning from start to finish. Communication was key for this one to get over the line successfully. Quality Process Services were responsible for:
-
Development of 10 weld procedures to ASME and Australian standards.
-
Procurement of all fabrication materials including pipe, fittings, studs, gaskets.
-
Workshop fabrication of 2 x DN400 vent lines & 1 x DN150 vent line.
-
Non-destructive testing of all welds.
-
Workshop hydro-testing of completed spools.
-
2 coat system applied to all spools.
-
Fabrication of structural support components.
-
Transportation of all materials to site.
-
Removal of existing vent line.
-
All civil works required - included 3 metre piers with caps.
-
Full site installation of vent lines and stacks, including field welding, NDT, hydro-testing, drying, coating.
-
Guy rope installation.
-
Dual lift for vent stack installation.
-
Structural support installation, including grouting.
-
Full MDR documentation package.