Tethys Transfer Pump Skids

Fabrication and welding of multiple structural skid frames and pipe spooling for large volume water transfer station. ​​

  • Procurement of all fabrication materials including pipe, fittings, structural beams, studs, gaskets.

  • Workshop fabrication of 2 x large transfer pump skids and 2 x small transfer pump skids including all associated pipe spooling.

  • Non-destructive testing of all welds.

  • Workshop hydro-testing of completed spools.

  • 2 coat system applied to all spools.

  • Fabrication of structural support components.

  • Assembly of pipe spooling on skids in workshop with complete flange management documentation

  • Fabrication, welding, hydrotesting and painting of all off skid tie-in spooling. 

  • Full MDR documentation package.